EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
BuckRV-8
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (1758)
Research
- (25)
Workshop
- (27)
Tools
- (7)
Tail Feathers
- (232)
Wings
- (172)
Fuselage
- (310)
Controls
- (58)
-
Stick grip labeling
-
RCP stick and grip
-
RCP stick grip prep
-
Rear cockpit stick
-
Throttle quadrant;...
-
Throttle quadrant;...
-
Rear cockpit throttle
-
Cabin heat cable;...
-
Throttle quadrant
-
Throttle quadrant
-
Throttle quadrant
-
Throttle quadrant
-
Cabin heat cable;...
-
Throttle cable...
-
Cabin heat mounting...
-
Firewall...
-
Cabin heat knob...
-
Throttle quadrant;...
-
Alternate Air and...
-
Engine controls
-
Throttle quadrant
-
Throttle quadrant...
-
Front cockpit stick...
-
Stick hole...
-
Stick hole...
-
Throttle arm...
-
Flaps-up microswitch...
-
Aileron rigging
-
Throttle quadrant (v.1)
-
Left brake line
-
Brake lines
-
Brake lines
-
Brake lines
-
Brake lines
-
Parking brake deletion
-
Brake lines
-
Rudder pedal...
-
Rudder pedals
-
Pedal assembly
-
Elevator horn...
-
Elevator horn drilling
-
Brake return springs
-
Pedal return springs
-
Pedal tension springs
-
Rudder stops and cables
-
Rudder pedals,...
-
Rudder cables and...
-
Elevator controls
-
Elevator and rudder...
-
Elevator mounting
-
Elevator mounting
-
Elevator mounting
-
Flight controls
-
Large elevator pushrod
-
Elevator pushrods;...
-
Elevator pushrods
-
Elevator bellcrank
-
Elevator bellcrank
Landing Gear
- (23)
Firewall Forward
- (194)
Avionics
- (90)
Lighting
- (3)
Instrument Panel
- (52)
Fuel System
- (23)
Electrical
- (175)
Baggage Door
- (17)
Cowl
- (79)
Canopy
- (95)
Windshield
- (58)
Wheel Pants
- (36)
Misc.
- (7)
Paperwork
- (4)
Paint / Decals
- (68)
Propeller
- (2)
Inspection
Assembly/Prep
- (1)
Test Flying
Builder Name:
Buck Wyndham
-
Project:
Vans - RV-8
-
VIEW REPORTS
Total Hours:
3914.15
Start/Last Date:
Jan 08, 2002 - No Finish Date
Engine:
AeroSport Power IO-375-M1S
Propeller:
Whirlwind 330-3B/72H-73 3-blade CS
Panel:
G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
Friendly URL:
https://eaabuilderslog.org?s=BuckRV-8
Home or Last Project Picture
Oct 16, 2007
Large elevator pushrod
- (1.3 hours)
Category: Controls
Finished assembling the large elevator pushrod. Drilled, deburred, and riveted the end caps in place, then primed the pushrod.
071016-01.jpg
071016-02.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.